Forum

FAQs and other general questions are answered here
By clarka
#20612
I want to lay horses at a specific percentage of BSP and then hedge based on subsequent movements. The percentage will be different for each horse. Is there a way to link entry points to an Excel spreadsheet with a defined % entry point for each horse?